
Share this story
✅ PROJECT COMPLETION | We’re delighted to share the completion photos for the Sunshine Signal Control Centre, a new build Kapitol completed for the Rail Network Alliance as part of the larger Metro Tunnel project.
The Control Centre is purpose-built to support more frequent train services being delivered by the Metro Tunnel and is equipped with the new signalling technology that will enable Melbourne’s new fleet of bigger, better trains to safely travel closer together.
It was a privilege to be a small part of a larger project which, once complete, will revolutionise public transport and travel across Melbourne.
Client: Rail Network Alliance
Architecture: Architectus
Engineers: WSP
Building Surveyor: Philip Chun Building Compliance
Photographer: Sarah Louise Photography - Construction Image Specialists
The Control Centre is purpose-built to support more frequent train services being delivered by the Metro Tunnel and is equipped with the new signalling technology that will enable Melbourne’s new fleet of bigger, better trains to safely travel closer together.
It was a privilege to be a small part of a larger project which, once complete, will revolutionise public transport and travel across Melbourne.
Client: Rail Network Alliance
Architecture: Architectus
Engineers: WSP
Building Surveyor: Philip Chun Building Compliance
Photographer: Sarah Louise Photography - Construction Image Specialists
Latest News

Water Testing at Yarra Valley Grammar
Kapitol conducts rigorous water testing at Yarra Valley Grammar to ensure the facade and windows meet strict waterproofing and durability standards.

Demolition Works at the Lindrum Redevelopment Underway
Kapitol Group, commercial builder, begins demolition on Time & Place’s Lindrum Redevelopment, balancing heritage preservation with urban transformation.

161 Eastern Road | Project Completion Walkthrough
Join our Project Manager's as they walk us through 161 Eastern Road.